PLANNING CONSIDERATION / 01Map the operational flow
Identify deliveries, parking, storage, work areas, and customer or employee access. The building position and door arrangement should support those movements. Discuss clear heights, loading needs, and any future expansion before selecting the footprint.
PLANNING CONSIDERATION / 02Treat occupancy as a design input
Storage, office, retail, and industrial uses can have different requirements. Confirm zoning, permitted use, fire protection, accessibility, utilities, and any professional design requirements with the responsible authorities. A building shell is not the same as an approved occupied business space.
PLANNING CONSIDERATION / 03Define who delivers each part
The project brief should distinguish the structural shell, slab, sitework, interior buildout, systems, and permit responsibilities. Discuss schedule needs without assuming an unverified completion promise. Final capabilities and trade responsibilities must be confirmed in writing.